OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in Texas, West
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Ca-CO-250B Battery storage |
250 MW | In study |
| Sf250SB Solar + storage |
250 MW | Agreement signed |
| Co200B Battery storage |
200 MW | Agreement signed |
| Wi-Al2-199SB Solar + storage |
199 MW | In study |
| Wi-Al3-199SB Solar + storage |
199 MW | In study |
| Wi-Al-199SB Solar + storage |
199 MW | In study |
| Ea150B Battery storage |
150 MW | In study |
| Sf150SB Solar + storage |
150 MW | Agreement signed |
| Ne100B Battery storage |
100 MW | Agreement signed |
| SS100S Solar |
100 MW | Agreement signed |
| Ne100S Solar |
100 MW | Agreement signed |
| SS50S Solar |
50.0 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)1,976 Β· 447.2 GW
- SPP (Southwest Power Pool)79 Β· 20.6 GW
- MISO (Midcontinent)27 Β· 6,659 MW
- West (non-ISO utilities)12 Β· 1,947 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)