United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Onshore wind interconnection queue in Southeast (non-ISO utilities)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown82,649 MW
Active in queue2,649 MW8 requests
Agreement signed1,849 MW6 requests
Withdrawn4411.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project GI-83, Randolph County
Onshore wind
1,018 MWAgreement signed Randolph, MOSoutheast Jun 2019target 2027
Onshore wind project GI-122, Randolph County
Onshore wind
500 MWIn study Randolph, MOSoutheast May 2024target 2028
Onshore wind project GI-123, Craig County
Onshore wind
300 MWIn study Craig, OKSoutheast Sep 2024target 2027
Onshore wind project GI-95, Dade County
Onshore wind
247 MWAgreement signed Dade, MOSoutheast Dec 2020target 2026
Onshore wind project GI-53, Nodaway County
Onshore wind
238 MWAgreement signed Nodaway, MOSoutheast May 2016target 2018
Onshore wind project GI-61, Nodaway County
Onshore wind
230 MWAgreement signed Nodaway, MOSoutheast May 2017target 2019
Onshore wind project GI-96, Lincoln County
Onshore wind
97.5 MWAgreement signed Lincoln, OKSoutheast Oct 2021target 2026
Onshore wind project GI-60, Gentry County
Onshore wind
18.0 MWAgreement signed Gentry, MOSoutheast Apr 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)