OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in Southeast (non-ISO utilities) (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown11843 MW
Active in queue2,517 MW28 requests
Agreement signed1,519 MW15 requests
Withdrawn20816.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

11 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Oakhurst Solar Farm
Solar + storage
200 MWIn study Mitchell, GASoutheast Apr 20172021
Solar project 276, Union County
Solar Β· FPL
74.5 MWIn study Union, FLSoutheast Jun 2017target 2029
Solar project 20
Solar
74.5 MWPaused / redesign FLSoutheast Oct 2017target 2019
Solar project 306, Brevard County
Solar Β· FPL
74.5 MWIn study Brevard, FLSoutheast Jun 2017target 2026
Solar project 280, Hendry County
Solar Β· FPL
74.5 MWIn study Hendry, FLSoutheast Jun 2017target 2027
Solar project 289, Miami-Dade County
Solar Β· FPL
74.5 MWIn study Miami-Dade, FLSoutheast Jun 2017target 2028
Solar project 193, Levy County
Solar Β· Origis Development LLC
70.0 MWIn study Levy, FLSoutheast Aug 2017target 2021
Solar project JEA-Q005-PV, Duval County
Solar
50.0 MWPaused / redesign Duval, FLSoutheast Dec 2017target 2035
Solar project JEA-Q006-PV, Duval County
Solar
50.0 MWPaused / redesign Duval, FLSoutheast Dec 2017target 2050
Solar project JEA-Q004-PV, Duval County
Solar
50.0 MWPaused / redesign Duval, FLSoutheast Dec 2017target 2050
Solar project JEA-Q003-PV, Duval County
Solar
50.0 MWPaused / redesign Duval, FLSoutheast Dec 2017target 2050

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)