United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESProjects with signed interconnection agreements in Southeast (non-ISO utilities) (2020 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)51 Β· 14.2 GW
- CAISO (California)32 Β· 12.6 GW
- PJM (Mid-Atlantic, Midwest)128 Β· 11.1 GW
- SPP (Southwest Power Pool)25 Β· 5,968 MW
- MISO (Midcontinent)32 Β· 5,106 MW
- West (non-ISO utilities)30 Β· 4,628 MW
- Southeast (non-ISO utilities)24 Β· 4,069 MW
- ISO-NE (New England)4 Β· 129 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)