United States β€Ί Grid β€Ί Interconnection queues β€Ί Missouri

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Missouri, SPP (2023 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown81,180 MW
Active in queue1,180 MW8 requests
Agreement signed0.0 MW0 requests
Withdrawn275,232 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery storage project GEN-2022-142, Clay County
Battery storage
200 MWIn study Clay, MOSPP Feb 2023target 2030
Battery storage project GEN-2022-144, Jackson County
Battery storage
200 MWIn study Jackson, MOSPP Feb 2023target 2030
Battery storage project GEN-2023-033, Clay County
Battery storage
200 MWIn study Clay, MOSPP Oct 2023target 2028
Battery storage project GEN-2023-170, Chariton County
Battery storage
150 MWIn study Chariton, MOSPP Oct 2023target 2028
Battery storage project GEN-2023-171, Jackson County
Battery storage
150 MWIn study Jackson, MOSPP Oct 2023target 2028
Battery storage project GEN-2022-102, Clay County
Battery storage
100 MWIn study Clay, MOSPP Jan 2023target 2027
Battery storage project GEN-2023-061, Jasper County
Battery storage
100 MWIn study Jasper, MOSPP Oct 2023target 2029
Solar + storage project GEN-2022-100, Cooper County
Solar + storage
80.0 MWIn study Cooper, MOSPP Mar 2023target 2028

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)