United States › Grid › Interconnection queues › Missouri
SOLAR + STORAGE · SPPSolar + storage project GEN-2022-100, Cooper County
Solar + storage project GEN-2022-100, Cooper County is a 80.0 MW solar + storage request in interconnection study in the SPP interconnection queue, in Cooper County, Missouri, connecting to KCPL.
Queue statusIn planning
- PlanningQueued Mar 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Mar 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2022-100
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- KCPL
- Connection point (POI)
- Overton - Sedalia East 161 kV Substation
- Location
- Cooper County, Missouri
- Technology
- Solar: 80.0 MW · Battery
- Total requested
- 80.0 MW
- Service type
- NRIS and ERIS
- Study phase
- FACILITY STUDY STAGE
- Queue status
- Active
- Entered queue
- 24 March 2023
- Proposed online date
- March 2028
Location
Marker shows the centre of Cooper County; the queue data does not give exact sites.
Other requests in Cooper County
- Solar project GEN-2024-054, Cooper CountySolar · 120 MW · in study
- Gas project GEN-2001-031, Cooper CountyGas · 596 MW · withdrawn
- Gas project GEN-2001-029, Cooper CountyGas · 540 MW · withdrawn
- Gas project GEN-2001-032, Cooper CountyGas · 528 MW · withdrawn
- Solar project GEN-2023-115, Cooper CountySolar · 300 MW · withdrawn
- Onshore wind project J1376, Cooper CountyOnshore wind · 100 MW · withdrawn
- Solar project GEN-2024-004, Cooper CountySolar · 20.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem