United States βΊ Grid βΊ Interconnection queues βΊ Missouri
SOLAR Β· SPPSolar project GEN-2024-004, Cooper County
Solar project GEN-2024-004, Cooper County is a 20.0 MW solar request withdrawn in the SPP interconnection queue, in Cooper County, Missouri, connecting to Evergy.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2024-004
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- Evergy
- Connection point (POI)
- Overton - Sedalia East 161 kV Substation
- Location
- Cooper County, Missouri
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 25 April 2024
- Proposed online date
- October 2026
- Withdrawn
- December 2024
Location
Marker shows the centre of Cooper County; the queue data does not give exact sites.
Other requests in Cooper County
- Solar project GEN-2024-054, Cooper CountySolar Β· 120 MW Β· in study
- Solar + storage project GEN-2022-100, Cooper CountySolar + storage Β· 80.0 MW Β· in study
- Gas project GEN-2001-031, Cooper CountyGas Β· 596 MW Β· withdrawn
- Gas project GEN-2001-029, Cooper CountyGas Β· 540 MW Β· withdrawn
- Gas project GEN-2001-032, Cooper CountyGas Β· 528 MW Β· withdrawn
- Solar project GEN-2023-115, Cooper CountySolar Β· 300 MW Β· withdrawn
- Onshore wind project J1376, Cooper CountyOnshore wind Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem