United States β€Ί Grid β€Ί Interconnection queues β€Ί Missouri

SOLAR Β· SPP

Solar project GEN-2024-004, Cooper County

Solar project GEN-2024-004, Cooper County is a 20.0 MW solar request withdrawn in the SPP interconnection queue, in Cooper County, Missouri, connecting to Evergy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandonedDec 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2024-004
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
Evergy
Connection point (POI)
Overton - Sedalia East 161 kV Substation
Location
Cooper County, Missouri
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
25 April 2024
Proposed online date
October 2026
Withdrawn
December 2024

Location

Marker shows the centre of Cooper County; the queue data does not give exact sites.