ONSHORE WIND Β· MISOOnshore wind project J1376, Cooper County
Onshore wind project J1376, Cooper County is a 100 MW onshore wind request withdrawn in the MISO interconnection queue, in Cooper County, Missouri, connecting to Ameren Missouri.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedAug 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1376
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Ameren Missouri
- Connection point (POI)
- Barnett - Georgetown Overton 161 kV Line Tap
- Location
- Cooper County, Missouri
- Technology
- Wind: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 29 April 2019
- Proposed online date
- July 2022
- Withdrawn
- August 2021
Location
Marker shows the centre of Cooper County; the queue data does not give exact sites.
Other requests in Cooper County
- Solar project GEN-2024-054, Cooper CountySolar Β· 120 MW Β· in study
- Solar + storage project GEN-2022-100, Cooper CountySolar + storage Β· 80.0 MW Β· in study
- Gas project GEN-2001-031, Cooper CountyGas Β· 596 MW Β· withdrawn
- Gas project GEN-2001-029, Cooper CountyGas Β· 540 MW Β· withdrawn
- Gas project GEN-2001-032, Cooper CountyGas Β· 528 MW Β· withdrawn
- Solar project GEN-2023-115, Cooper CountySolar Β· 300 MW Β· withdrawn
- Solar project GEN-2024-004, Cooper CountySolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem