United States β€Ί Grid β€Ί Interconnection queues β€Ί Louisiana

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Louisiana, SPP

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown92,301 MW
Active in queue2,301 MW9 requests
Agreement signed511 MW4 requests
Withdrawn195,822 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project GEN-2024-379, Bossier Parish County
Gas
1,350 MWIn study Bossier Parish, LASPP Mar 2025target 2031
Solar project GEN-2018-050, Caddo Parish County
Solar
200 MWAgreement signed Caddo Parish, LASPP May 2018target 2028
Battery storage project GEN-2024-177, Bossier Parish County
Battery storage
199 MWIn study Bossier Parish, LASPP Mar 2025target 2029
Solar project GEN-2018-106, Caddo Parish County
Solar
165 MWAgreement signed Caddo Parish, LASPP Nov 2018target 2028
Solar + storage project GEN-2023-230, Bossier Parish County
Solar + storage
150 MWIn study Bossier Parish, LASPP Oct 2023target 2028
Solar project GEN-2016-167, Caddo Parish County
Solar
73.5 MWAgreement signed Caddo Parish, LASPP Nov 20162024
Solar project GEN-2017-057, Caddo Parish County
Solar
72.5 MWAgreement signed Caddo Parish, LASPP May 20172025
Solar + storage project GEN-2024-220, Caddo Parish County
Solar + storage
55.0 MWIn study Caddo Parish, LASPP Mar 2025target 2030
Solar + storage project GEN-2024-044, Caddo Parish County
Solar + storage
36.0 MWIn study Caddo Parish, LASPP Oct 2024target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)