United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESOnshore wind interconnection queue in NYISO (New York)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Bull Run II Wind Onshore wind Β· Bull Run Energy LLC |
449 MW | In study |
| North Country Wind Onshore wind Β· NY North Country, LLC |
380 MW | In study |
| North Country Wind II Onshore wind Β· NY North Country, LLC |
380 MW | In study |
| Alle Catt II Wind Onshore wind Β· Alle-Catt Wind Energy LLC |
339 MW | In study |
| Canisteo Wind Onshore wind Β· Canisteo Wind Energy LLC |
291 MW | In study |
| Maple Harvest Wind Onshore wind Β· Maple Harvest Wind |
162 MW | In study |
| Prattsburgh Wind Farm Onshore wind Β· Prattsburgh Wind, LLC |
147 MW | In study |
| Heritage Wind Onshore wind Β· Heritage Wind, LLC |
126 MW | In study |
| High Bridge Wind Onshore wind Β· High Bridge Wind, LLC |
101 MW | In study |
| Agricola Wind Onshore wind Β· Agricola Wind LLC |
97.0 MW | In study |
| Hemlock Hollow Wind Onshore wind Β· Liberty Renewables Inc. |
95.0 MW | In study |
| Hoffman Falls Wind Onshore wind Β· Hoffman Falls Wind LLC |
72.0 MW | In study |
| Dewdrop Wind Onshore wind Β· Dewdrop Wind LLC |
62.0 MW | In study |
| Azalea Wind 1 Onshore wind Β· Azalea Wind LLC |
50.0 MW | In study |
| Azalea Wind 2 Onshore wind Β· Azalea Wind LLC |
50.0 MW | In study |
| Buttercup Wind Onshore wind Β· Buttercup Wind LLC |
49.9 MW | In study |
| Goldenrod Wind Onshore wind Β· Goldenrod Wind LLC |
39.0 MW | In study |
| Hoffman Falls Wind 2 Onshore wind Β· Liberty Renewables Inc. |
29.8 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)229 Β· 63.5 GW
- ERCOT (Texas)180 Β· 52.5 GW
- MISO (Midcontinent)208 Β· 42.7 GW
- SPP (Southwest Power Pool)121 Β· 26.7 GW
- PJM (Mid-Atlantic, Midwest)50 Β· 7,885 MW
- NYISO (New York)18 Β· 2,919 MW
- Southeast (non-ISO utilities)8 Β· 2,649 MW
- CAISO (California)10 Β· 1,252 MW
- ISO-NE (New England)2 Β· 22.9 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)