United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in MISO (Midcontinent) (2023 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Battery storage project J2766, Howard County Battery storage |
190 MW | Withdrawn / abandoned |
| Replacing 180MW with BESS of the existing 280 MW Steam; LANSING 4 Other |
180 MW | Withdrawn / abandoned |
| Solar project J2393, Coles County Solar |
164 MW | Withdrawn / abandoned |
| Solar project J2612, Madison County Solar |
150 MW | Withdrawn / abandoned |
| Solar project J2770, Grant Parish County Solar |
125 MW | Withdrawn / abandoned |
| Solar project J2721, Panola County Solar |
120 MW | Withdrawn / abandoned |
| Replacing 100 MW of gas generation with solar generation; Tidelands Other |
100 MW | Withdrawn / abandoned |
| Battery storage project J1695, Perry County Battery storage |
50.0 MW | Withdrawn / abandoned |
| Solar + storage project J2780, Pulaski County Solar + storage |
33.0 MW | Withdrawn / abandoned |
| Replacing 31 MW of generation with linear generators powered by natural gas; Burlington 3 Gas |
31.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- CAISO (California)486 Β· 198.6 GW
- West (non-ISO utilities)547 Β· 166.5 GW
- SPP (Southwest Power Pool)336 Β· 71.5 GW
- NYISO (New York)138 Β· 40.7 GW
- Southeast (non-ISO utilities)331 Β· 40.7 GW
- ERCOT (Texas)85 Β· 16.1 GW
- ISO-NE (New England)119 Β· 15.7 GW
- MISO (Midcontinent)10 Β· 1,143 MW
- PJM (Mid-Atlantic, Midwest)11 Β· 867 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)