OTHER · MISO

Replacing 100 MW of gas generation with solar generation; Tidelands

Replacing 100 MW of gas generation with solar generation; Tidelands is a 100 MW other request withdrawn in the MISO interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
R1033
Grid region
MISO (Midcontinent)
Connection point (POI)
Waterford 230kV
Technology
Solar: 100 MW · Other
Total requested
100 MW
Queue status
Withdrawn
Entered queue
13 February 2023
Proposed online date
February 2024

Location

No county location in the queue data.

Power plants in · Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem