OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in MISO (Midcontinent) (2010 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown13868 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn7210.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

13 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project J183, Rock County
Onshore wind
200 MWOperating Rock, MNMISO Nov 2010target 2012
Onshore wind project J161, Tuscola County
Onshore wind
155 MWOperating Tuscola, MIMISO Aug 20102012
Onshore wind project J132, Gratiot County
Onshore wind
125 MWOperating Gratiot, MIMISO May 20102007
Onshore wind project J191, Cass County
Onshore wind
101 MWOperating Cass, IAMISO Dec 20102012
Onshore wind project J122, Huron County
Onshore wind
60.0 MWOperating Huron, MIMISO Apr 20102012
Gas project J142, Wood County
Gas
59.7 MWOperating Wood, WIMISO Jun 2010target 2011
Onshore wind project G997, Huron County
Onshore wind
50.0 MWOperating Huron, MIMISO Dec 20102009
Gas project J174, Jefferson County
Gas
43.8 MWOperating Jefferson, WIMISO Nov 20102011
Coal project J143, Ontonagon County
Coal
40.0 MWOperating Ontonagon, MIMISO Jun 2010
Hydro project J145, Miller County
Hydro
14.0 MWOperating Miller, MOMISO Jun 20102004
Other project J110, Morton County
Other
7.5 MWOperating Morton, NDMISO Jan 20102011
Other project J171, Swift County
Other
7.0 MWOperating Swift, MNMISO Oct 20102010
Onshore wind project J112, Winona County
Onshore wind
4.9 MWOperating Winona, MNMISO Jan 20102009

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)