United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in ISO-NE (New England) (2024 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Battery Storage Battery storage |
500 MW | In study |
| Battery Storage Battery storage |
500 MW | In study |
| Willard Storage (NYISO-C24-148) Battery storage |
300 MW | In study |
| Battery Storage Battery storage |
300 MW | In study |
| Battery Storage Battery storage |
290 MW | In study |
| Battery Storage Battery storage |
225 MW | In study |
| Battery Storage Battery storage |
200 MW | In study |
| Battery Storage Battery storage |
180 MW | In study |
| Battery Storage Battery storage |
170 MW | In study |
| Battery Storage Battery storage |
170 MW | In study |
| NY Chateaugay 0 Willis Rd Storage (NYISO-C24-304-004) Battery storage |
150 MW | In study |
| Battery Storage Battery storage |
136 MW | In study |
| Battery Storage Battery storage |
125 MW | In study |
| Battery Storage Battery storage |
19.3 MW | In study |
| Battery Storage Battery storage |
19.3 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)436 Β· 104.7 GW
- MISO (Midcontinent)290 Β· 62.9 GW
- West (non-ISO utilities)192 Β· 45.5 GW
- Southeast (non-ISO utilities)178 Β· 35.0 GW
- SPP (Southwest Power Pool)81 Β· 18.0 GW
- NYISO (New York)89 Β· 15.6 GW
- ISO-NE (New England)15 Β· 3,285 MW
- PJM (Mid-Atlantic, Midwest)2 Β· 95.0 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)