Interconnection queue in ISO-NE (New England) (2024 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown153,285 MW
Active in queue3,285 MW15 requests
Agreement signed0.0 MW0 requests
Withdrawn9713.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

15 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery Storage
Battery storage
500 MWIn study Middlesex, MAISO-NE Jun 2024target 2028
Battery Storage
Battery storage
500 MWIn study Barnstable, MAISO-NE May 2024target 2028
Willard Storage (NYISO-C24-148)
Battery storage
300 MWIn study Rensselaer, NYISO-NE Dec 2024target 2028
Battery Storage
Battery storage
300 MWIn study Worcester, MAISO-NE Apr 2024target 2028
Battery Storage
Battery storage
290 MWIn study Berkshire, MAISO-NE Apr 2024target 2028
Battery Storage
Battery storage
225 MWIn study Essex, MAISO-NE Jun 2024target 2028
Battery Storage
Battery storage
200 MWIn study Essex, MAISO-NE Jun 2024target 2028
Battery Storage
Battery storage
180 MWIn study Worcester, MAISO-NE May 2024target 2028
Battery Storage
Battery storage
170 MWIn study Berkshire, MAISO-NE May 2024target 2029
Battery Storage
Battery storage
170 MWIn study Hampden, MAISO-NE May 2024target 2029
NY Chateaugay 0 Willis Rd Storage (NYISO-C24-304-004)
Battery storage
150 MWIn study Franklin, NYISO-NE Dec 2024target 2028
Battery Storage
Battery storage
136 MWIn study Berkshire, MAISO-NE Apr 2024target 2028
Battery Storage
Battery storage
125 MWIn study Middlesex, MAISO-NE Jun 2024target 2028
Battery Storage
Battery storage
19.3 MWIn study Windsor, VTISO-NE Feb 2024target 2029
Battery Storage
Battery storage
19.3 MWIn study Franklin, VTISO-NE Mar 2024target 2029

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)