Interconnection queue in ISO-NE (New England) (2023 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown61,053 MW
Active in queue1,053 MW6 requests
Agreement signed0.0 MW0 requests
Withdrawn11915.7 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery Storage
Battery storage
350 MWIn study Bristol, MAISO-NE Oct 2023target 2027
Battery Storage
Battery storage
250 MWIn study Hampden, MAISO-NE Mar 2023target 2029
Solar
Solar
180 MWIn study York, MEISO-NE Jul 2023target 2029
Battery Storage
Battery storage
168 MWIn study Bristol, MAISO-NE Jun 2023target 2027
Solar
Solar
100 MWIn study Rockingham, NHISO-NE Jul 2023target 2028
Solar Increase
Solar
5.0 MWIn study Hartford, CTISO-NE Feb 2023target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)