United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in ISO-NE (New England) (2022 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown81,031 MW
Active in queue1,031 MW8 requests
Agreement signed706 MW6 requests
Withdrawn9812.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Battery Storage
Battery storage
300 MWIn study Norfolk, MAISO-NE Mar 2022target 2028
Battery Storage
Battery storage
204 MWAgreement signed Worcester, MAISO-NE Oct 2022target 2027
Battery Storage Addition (to QP1086)
Solar + storage
160 MWAgreement signed Knox, MEISO-NE May 2022target 2026
Solar
Solar
150 MWAgreement signed Hartford, CTISO-NE Mar 2022target 2028
Battery Storage
Battery storage
142 MWAgreement signed Litchfield, CTISO-NE Oct 2022target 2029
West Springfield 45 MW BESS
Battery storage
45.0 MWAgreement signed Hampden, MAISO-NE Jun 2022target 2029
Solar
Solar
25.0 MWIn study Hartford, CTISO-NE Apr 2022target 2027
Grissom Solar
Solar
5.0 MWAgreement signed Sullivan, NHISO-NE Mar 2022target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)