Withdrawn queue requests in CAISO (California) (2023 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown486198.6 GW
Active in queue53.4 GW107 requests
Agreement signed0.0 MW0 requests
Withdrawn486198.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

486 requests Β· page 1 of 10
ProjectCapacityStatusLocationRegionQueuedOnline
Cuatro Vientos
Wind + storage
3,527 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Chokecherry and Sierra Madre Wind Energy Project
Onshore wind
3,290 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Ventura Wind
Onshore wind
2,482 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Monterey Wind
Onshore wind
2,462 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Oaks Wind
Onshore wind
2,460 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Charlie Wind
Onshore wind
2,460 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Boson
Solar + storage
2,347 MWWithdrawn / abandoned Kern, CACAISO Apr 2023target 2028
Ashton Energy Center
Solar + storage
2,049 MWWithdrawn / abandoned Nye, NVCAISO Apr 2023target 2032
BlueWater Solar
Solar + storage
2,031 MWWithdrawn / abandoned La Paz, AZCAISO Apr 2023target 2028
Ethan Creek
Onshore wind
1,870 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Chance Solar
Solar + storage
1,790 MWWithdrawn / abandoned Nye, NVCAISO Apr 2023target 2028
Gema Hybrid
Solar + storage
1,547 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Two Bunch Palms
Battery storage
1,518 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Icarus Solar
Solar + storage
1,435 MWWithdrawn / abandoned Mohave, AZCAISO Apr 2023target 2032
Southern Sierra PSP
Other
1,392 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Helms PSP Uprate
Battery storage
1,392 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
White Hills Solar Project
Solar + storage
1,278 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Borderline Solar
Solar + storage
1,268 MWWithdrawn / abandoned Inyo, CACAISO Apr 2023target 2028
Magic Valley Wind 1
Wind + storage
1,239 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Redwood Coast Offshore Wind 2
Offshore wind
1,206 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Redwood Coast Offshore Wind 1
Offshore wind
1,206 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Whispering Sands Solar
Solar + storage
1,202 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Herculean
Solar + storage
1,198 MWWithdrawn / abandoned CACAISO Apr 2023target 2031
Meson
Solar + storage
1,191 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
MidBishop Energy Storage
Battery storage
1,191 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Titan Power
Battery storage
1,160 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Nightcap
Gas
1,122 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2023target 2028
Elixir
Gas
1,101 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Hideout
Gas
1,101 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Taurus Wind
Wind + storage
1,088 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Blackbird
Solar + storage
1,057 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Egret
Solar + storage
1,057 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Heron
Solar + storage
1,056 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
FiveGB
Solar + storage
1,041 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Algodones Storage
Battery storage
1,039 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Harquahala Sunrise 3
Solar + storage
1,038 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Diablo Sands Energy Storage
Battery storage
1,036 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Rumorosa Wind
Onshore wind
1,029 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Skylar Verano Solar
Solar + storage
1,027 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Glyder
Solar + storage
1,026 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Amargosa SEZ
Solar + storage
1,019 MWWithdrawn / abandoned Nye, NVCAISO Apr 2023target 2030
Frontera
Solar + storage
1,018 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Spotted Horse
Solar + storage
1,016 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Laramide Storage
Battery storage
1,000 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Greyhound Storage
Battery storage
1,000 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Ripple Solar
Solar + storage
946 MWWithdrawn / abandoned CACAISO Apr 2023target 2031
Nathan Creek
Onshore wind
935 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Jonathan Creek
Onshore wind
935 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Yuha Desert Battery Storage 2
Battery storage
900 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Wonder Solar
Solar + storage
892 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Page 1 of 10

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)