SOLAR + STORAGE Β· CAISORipple Solar
Ripple Solar is a 946 MW solar + storage request withdrawn in the CAISO interconnection queue, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2023 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 54684
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- DIABLO-GATES #1
- Location
- California
- Technology
- Solar: 945 MW Β· Battery: 1.0 MW
- Total requested
- 946 MW
- Service type
- Energy only (ERIS)
- Study phase
- Caiso Cluster 15 Unvalidated
- Queue status
- Withdrawn
- Entered queue
- 17 April 2023
- Proposed online date
- October 2031
- Withdrawn
- December 2024
Location
No county location in the queue data.