United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR + STORAGE Β· CAISO

Ripple Solar

Ripple Solar is a 946 MW solar + storage request withdrawn in the CAISO interconnection queue, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2023 (completed)
  2. Withdrawn / abandonedDec 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
54684
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
DIABLO-GATES #1
Location
California
Technology
Solar: 945 MW Β· Battery: 1.0 MW
Total requested
946 MW
Service type
Energy only (ERIS)
Study phase
Caiso Cluster 15 Unvalidated
Queue status
Withdrawn
Entered queue
17 April 2023
Proposed online date
October 2031
Withdrawn
December 2024

Location

No county location in the queue data.

Power plants in California Β· Transmission lines in California

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem