United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in CAISO (California) (2018 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown41,302 MW
Active in queue6,790 MW23 requests
Agreement signed5,488 MW19 requests
Withdrawn6721.7 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Arida Solar Farm
Solar + storage
740 MWIn study Clark, NVCAISO Apr 2018target 2027
Vulcan
Solar + storage
500 MWIn study Maricopa, AZCAISO Apr 2018target 2027
Prospect Energy Storage
Battery storage
58.8 MWPaused / redesign Sacramento, CACAISO Apr 2018target 2028
Milpa Power Bank
Battery storage
3.0 MWIn study Santa Clara, CACAISO Apr 2018target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)