United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in CAISO (California) (2013 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Garland Solar + storage |
288 MW | |
| Fifth Standard Solar Solar + storage |
267 MW | |
| Northern Orchard Solar Solar + storage |
192 MW | |
| Mesquite Solar 2 Solar |
101 MW | |
| Los Medanos Energy Center Gas |
72.0 MW | |
| Sunshine Valley Solar 2 Solar |
50.0 MW | |
| Palomar Energy Center 2 Gas |
35.0 MW | |
| Lecu Gas |
24.0 MW | |
| Java Solar Solar |
13.5 MW | |
| Pearblossom Solar Solar |
9.5 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)33 Β· 6,195 MW
- PJM (Mid-Atlantic, Midwest)63 Β· 5,035 MW
- Southeast (non-ISO utilities)7 Β· 3,676 MW
- SPP (Southwest Power Pool)11 Β· 1,722 MW
- MISO (Midcontinent)16 Β· 1,513 MW
- West (non-ISO utilities)53 Β· 1,485 MW
- CAISO (California)10 Β· 1,052 MW
- ISO-NE (New England)7 Β· 666 MW
- NYISO (New York)6 Β· 504 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)