United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESProjects with signed interconnection agreements in CAISO (California) (2021 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Darden Solar + storage |
2,365 MW | Agreement signed |
| Umbriel Solar + storage |
2,365 MW | Agreement signed |
| Wingtip Solar 1 Solar + storage |
2,352 MW | Agreement signed |
| Holman Wind + storage |
2,282 MW | Agreement signed |
| Euismod Solar + storage |
1,247 MW | Agreement signed |
| Mosey Solar + storage |
1,081 MW | Agreement signed |
| Silver Star Solar Solar + storage |
1,034 MW | Agreement signed |
| Sunbaked Solar Solar + storage |
1,024 MW | Agreement signed |
| Rock Valley Energy Center Solar + storage |
1,024 MW | Agreement signed |
| Easley Solar + storage |
940 MW | Agreement signed |
| Buttonbush Solar 2 Solar + storage |
716 MW | Agreement signed |
| Presidio Solar + storage |
713 MW | Agreement signed |
| Kawich Solar + storage |
700 MW | Agreement signed |
| Cady Solar Solar + storage |
626 MW | Agreement signed |
| Australis Solar + storage |
614 MW | Agreement signed |
| Cornucopia Hybrid Solar + storage |
605 MW | Agreement signed |
| Twin Palms Solar Solar + storage |
576 MW | Agreement signed |
| Redonda Solar + storage |
542 MW | Agreement signed |
| Alta Casa Storage Battery storage |
515 MW | Agreement signed |
| Greasewood Energy Storage Battery storage |
513 MW | Agreement signed |
| Conduit Energy Storage Battery storage |
513 MW | Agreement signed |
| Lock Storage Battery storage |
508 MW | Agreement signed |
| Drifter Energy Storage Battery storage |
505 MW | Agreement signed |
| Spectrum Energy Storage Battery storage |
504 MW | Agreement signed |
| Delilah Energy Storage Battery storage |
504 MW | Agreement signed |
| Elysian Solar + storage |
412 MW | Agreement signed |
| Dos Palmas Battery storage |
411 MW | Agreement signed |
| Hidalgo Energy Storage Battery storage |
408 MW | Agreement signed |
| Clarkson Solar + storage |
408 MW | Agreement signed |
| Gabriel Storage Battery storage |
406 MW | Agreement signed |
| Trolley Battery storage |
406 MW | Agreement signed |
| Marici Battery storage |
406 MW | Agreement signed |
| Golden Flats Battery storage |
365 MW | Agreement signed |
| Espresso Battery storage |
365 MW | Agreement signed |
| Allegheny Energy Storage Battery storage |
353 MW | Agreement signed |
| Ariella Solar Solar + storage |
327 MW | Agreement signed |
| Spikes Peak Solar Solar + storage |
318 MW | Agreement signed |
| Haven Storage Battery storage |
313 MW | Agreement signed |
| Elion Energy Storage Battery storage |
302 MW | Agreement signed |
| Tyrell Energy Storage Battery storage |
302 MW | Agreement signed |
| Tabla Energy Storage Battery storage |
302 MW | Agreement signed |
| Electron Battery storage |
300 MW | Agreement signed |
| Pathfinder Storage Battery storage |
268 MW | Agreement signed |
| J90 Energy Storage Battery storage |
261 MW | Agreement signed |
| Commerce Energy Storage 3 Battery storage |
256 MW | Agreement signed |
| Ciervo Mountain Hybrid Solar + storage |
255 MW | Agreement signed |
| Sandrift Storage 1 Battery storage |
255 MW | Agreement signed |
| Sandrift Storage 2 Battery storage |
255 MW | Agreement signed |
| Greenwood Energy Storage Battery storage |
252 MW | Agreement signed |
| Zorin Storage Battery storage |
252 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- CAISO (California)68 Β· 35.4 GW
- ERCOT (Texas)91 Β· 16.3 GW
- West (non-ISO utilities)55 Β· 11.7 GW
- ISO-NE (New England)17 Β· 3,473 MW
- SPP (Southwest Power Pool)19 Β· 3,459 MW
- Southeast (non-ISO utilities)12 Β· 1,908 MW
- MISO (Midcontinent)8 Β· 1,055 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)