United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in the USA — page 79
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar + storage project GI-CS-2025-23, Las Animas County Solar + storage |
150 MW | In study |
| Solar + storage project 708, Ada County Solar + storage |
150 MW | In study |
| Kce NY 37 Battery storage · KCE NY 37, LLC |
150 MW | In study |
| Battery storage project GEN-2025-SR3, Clark County Battery storage |
150 MW | In study |
| Battery storage project AG2-270, Halifax County Battery storage · Clover Storage, LLC |
150 MW | In study |
| Cathode BESS Battery storage · CED Development Inc. |
150 MW | In study |
| Solar project J1641, Greene County Solar |
150 MW | In study |
| Solar project J1638, Hancock County Solar |
150 MW | In study |
| Solar + storage project S1120, Knox County Solar + storage |
150 MW | In study |
| Photo Solar 1 Solar + storage · CED Development Inc. |
150 MW | In study |
| Battery storage project GI-SISS-2025-05, Kit Carson County Battery storage |
150 MW | In study |
| Dawson Solar Solar |
150 MW | In study |
| Farmhouse BESS Battery storage · RWE Solar Development, LLC |
150 MW | In study |
| Battery storage project GEN-2024-277, Shawnee County Battery storage |
150 MW | In study |
| Onshore wind project GI-1509, Stark County Onshore wind |
150 MW | In study |
| Solar project J1744, Cumberland County Solar |
150 MW | In study |
| Solar project J1651, Logan County Solar |
150 MW | In study |
| Solar project 278, Williamsburg County Solar |
150 MW | In study |
| Gas project AH1-715, Union County Gas · Parkway Generation Operating LLC |
149 MW | In study |
| Pilesgrove Solar Project Solar |
149 MW | Paused / redesign |
| Maroon Solar Solar |
149 MW | Paused / redesign |
| Enclave Solar Energy Center Solar |
149 MW | Paused / redesign |
| Surplus; J806 Other |
149 MW | In study |
| Solar project J3679, Laporte County Solar |
149 MW | In study |
| Ponferrada Solar Solar · Karol Solar VI |
149 MW | In study |
| Solar + storage project AI2-445, Tucker County Solar + storage |
148 MW | In study |
| Galaxy Solar Solar + storage · Galaxy Solar, LLC |
148 MW | In study |
| Rain Lily Solar 1 Solar + storage · Rain Lily Solar 1 LLC |
148 MW | In study |
| High Chaparral Solar 138kV Solar · High Chaparral Solar Project, LLC |
148 MW | Paused / redesign |
| John Bull BESS Battery storage · BRP BLUE TOPAZ 13, LLC |
147 MW | In study |
| Onshore wind project J1755, Bureau County Onshore wind |
147 MW | In study |
| Solar project J2861, Mower County Solar |
147 MW | In study |
| Onshore wind project AG2-062, Grant County Onshore wind · Catamount Wind LLC |
147 MW | In study |
| Chisme Solar Solar + storage · Blue Heron Solar, LLC |
147 MW | In study |
| Prattsburgh Wind Farm Onshore wind · Prattsburgh Wind, LLC |
147 MW | In study |
| Onshore wind project J3754, Iroquois County Onshore wind |
147 MW | In study |
| Onshore wind project J3755, Iroquois County Onshore wind |
147 MW | In study |
| Neal Solar Solar + storage · CH Neal Solar LLC |
147 MW | In study |
| Wensowitch Solar Solar · Greenalia Solar Power Wensowitch LLC |
146 MW | In study |
| Chisme Storage Solar + storage · Blue Heron Solar, LLC |
146 MW | In study |
| Onshore wind project J4054, Saginaw County Onshore wind |
146 MW | In study |
| Solar project J3761, Ogemaw County Solar |
146 MW | In study |
| Solar project AH2-085, Dekalb County Solar |
145 MW | In study |
| Solar project GEN-2022-065, Edwards County Solar |
145 MW | In study |
| Other project PP00034, Lee County Other |
145 MW | In study |
| Kensington Solar Solar |
145 MW | Paused / redesign |
| Other project Q548, Pinal County Other |
145 MW | In study |
| Noria Solar DCC Solar |
145 MW | Paused / redesign |
| Solar + storage project J3184, St. Clair County Solar + storage |
145 MW | In study |
| Onshore wind project J2311, Putnam County Onshore wind |
145 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)