United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in ERCOT (Texas) (2021 requests) β€” page 5

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown20739.5 GW
Active in queue39.5 GW207 requests
Agreement signed16.3 GW91 requests
Withdrawn7713.4 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

207 requests Β· page 5 of 5
ProjectCapacityStatusLocationRegionQueuedOnline
Enchanted Rock NEWPP
Gas Β· Generate ER-NG, LLC
30.0 MWAgreement signed Harris, TXERCOT Nov 2021target 2026
Fowler Ranch Storage
Battery storage Β· Crane BESS, LLC
26.1 MWIn study Crane, TXERCOT Jun 2021target 2027
Midlothian 4 repower
Gas Β· MIDLOTHIAN ENERGY, LLC
18.0 MWIn study Ellis, TXERCOT Apr 2021target 2026
Midlothian Unit 2 repower
Gas Β· MIDLOTHIAN ENERGY, LLC
18.0 MWIn study Ellis, TXERCOT Jan 2021target 2026
Midlothian Unit 3 repower
Gas Β· MIDLOTHIAN ENERGY, LLC
18.0 MWIn study Ellis, TXERCOT May 2021target 2026
Greater Bryant G Solar
Solar Β· Greater Bryant G Solar, LLC
17.7 MWAgreement signed Midland, TXERCOT Jun 2021target 2026
Anchor Wind III
Onshore wind Β· RANCHLAND WIND PROJECT LLC
16.0 MWAgreement signed Eastland, TXERCOT Dec 2021target 2025
Page 5 of 5

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)