🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in the USA — page 485

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown24,2054,519.8 GW
Active in queue2,001.0 GW9,187 requests
Agreement signed423.2 GW2,141 requests
Withdrawn24,2054,519.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

24,205 requests · page 485 of 485
ProjectCapacityStatusLocationRegionQueuedOnline
Solar plus Battery Increase (QP1129)
Solar + storage
0.0 MWWithdrawn / abandoned Bristol, MAISO-NE Aug 2022target 2022
Battery storage project AB1-042, Anne Arundel County
Battery storage
0.0 MWWithdrawn / abandoned Anne Arundel, MDPJM Aug 2015target 2015
Snyder Wind Repower
Onshore wind
-15.0 MWWithdrawn / abandoned Scurry, TXERCOT Mar 2019
Potter Repowering
Gas
-21.2 MWWithdrawn / abandoned Norfolk, MAISO-NE Feb 2014target 2019
Battery storage project 554, Grundy County
Battery storage
-75.0 MWWithdrawn / abandoned Grundy, TNSoutheast May 2023target 2026
Page 485 of 485

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)