OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in ERCOT (Texas) (2020 requests) β page 3
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Lubio Solar Solar Β· BDPU Solar Lubio LLC |
54.5 MW | Agreement signed |
| Dori BQ Solar Solar + storage Β· Sunnyside Energy, LLC |
50.4 MW | Agreement signed |
| Tain Solar Solar Β· Abei Energy Green VII LLC |
37.5 MW | In study |
| Delaware Ranch Solar Solar Β· Delaware Ranch Solar, LLC |
36.0 MW | Agreement signed |
| Ty Cooke Gas |
33.0 MW | Paused / redesign |
| Hayhurst Texas Solar Solar Β· Hayhurst Texas Solar, LLC |
24.8 MW | Agreement signed |
| Brazos Wind Repower Onshore wind Β· BRAZOS WIND VENTURES, LLC |
22.4 MW | In study |
| Hays Energy Unit 3 Repower Gas Β· HAYS ENERGY, LLC |
18.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)108 Β· 26.4 GW
- West (non-ISO utilities)100 Β· 24.5 GW
- PJM (Mid-Atlantic, Midwest)178 Β· 16.6 GW
- CAISO (California)41 Β· 16.3 GW
- MISO (Midcontinent)95 Β· 15.7 GW
- SPP (Southwest Power Pool)35 Β· 8,165 MW
- Southeast (non-ISO utilities)55 Β· 7,020 MW
- NYISO (New York)19 Β· 2,230 MW
- ISO-NE (New England)4 Β· 129 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)