United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in CAISO (California) (2021 requests) β page 3
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Desert Jewel Storage Battery storage |
206 MW | Agreement signed |
| Phaenon Solar + storage |
204 MW | In study |
| Huaso Hybrid Solar + storage |
204 MW | Agreement signed |
| Puma Storage Battery storage |
204 MW | In study |
| Seahawk Storage Battery storage |
204 MW | Agreement signed |
| Cougar Storage Battery storage |
204 MW | Agreement signed |
| Apache Storage Battery storage |
204 MW | Agreement signed |
| Everest Energy Storage Battery storage |
202 MW | In study |
| Merlin Storage Battery storage |
200 MW | In study |
| Buttercup Hybrid Solar Solar + storage |
197 MW | In study |
| Black Diamond ES2 Battery storage |
179 MW | Agreement signed |
| Bobor Storage Battery storage |
152 MW | In study |
| Flores Storage Battery storage |
152 MW | In study |
| El Rey Power Bank Battery storage |
124 MW | In study |
| Wildhorse Energy Center Battery storage |
122 MW | In study |
| High Winds Storage Battery storage |
121 MW | In study |
| Serena Storage Battery storage |
114 MW | Agreement signed |
| Sienna Solar 2 Solar + storage |
112 MW | In study |
| Oakdale Storage Battery storage |
103 MW | Agreement signed |
| Los Nietos Battery storage |
102 MW | Agreement signed |
| Arges BESS Battery storage |
102 MW | In study |
| Pajaro Valley Storage Battery storage |
102 MW | In study |
| Tokay Storage Battery storage |
102 MW | Agreement signed |
| Double Springs Energy Storage Battery storage |
101 MW | Agreement signed |
| Sunbeam Storage Battery storage |
101 MW | Agreement signed |
| Eiger Energy Storage Battery storage |
101 MW | In study |
| Peaceful Hollow BESS Battery storage |
100 MW | Agreement signed |
| Valetudo Energy Storage Battery storage |
79.6 MW | In study |
| Palmetto Energy Storage Battery storage |
75.6 MW | In study |
| Tarragon Hybrid Solar + storage |
71.9 MW | In study |
| Hammerhead Storage Battery storage |
71.3 MW | In study |
| Mayacamas Geothermal Geothermal |
53.0 MW | In study |
| Geranium Energy Storage Battery storage |
51.4 MW | In study |
| Orleans Solar + storage |
51.1 MW | Agreement signed |
| Township Power Bank Battery storage |
50.5 MW | In study |
| Verbena Energy Storage Battery storage |
50.5 MW | In study |
| Kifer BESS 1 Battery storage |
50.0 MW | In study |
| Hidden Knolls BESS Battery storage |
30.8 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)228 Β· 68.8 GW
- CAISO (California)138 Β· 66.9 GW
- ERCOT (Texas)207 Β· 39.5 GW
- MISO (Midcontinent)136 Β· 23.7 GW
- Southeast (non-ISO utilities)63 Β· 12.7 GW
- SPP (Southwest Power Pool)44 Β· 9,029 MW
- ISO-NE (New England)20 Β· 3,998 MW
- PJM (Mid-Atlantic, Midwest)49 Β· 2,072 MW
- NYISO (New York)11 Β· 991 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)