United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in the USA (2017 requests) β page 26
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| North Bergen I 480V Gas |
0.2 MW | Withdrawn / abandoned |
| Hydro project 908, Davis County Hydro |
0.2 MW | Withdrawn / abandoned |
| Paramus 480V Gas |
0.2 MW | Withdrawn / abandoned |
| Gas project AD1-006, Hudson County Gas |
0.2 MW | Withdrawn / abandoned |
| Sand Hills 480V Gas |
0.2 MW | Withdrawn / abandoned |
| Atheina 480V Gas |
0.2 MW | Withdrawn / abandoned |
| Gas project AD1-012, Middlesex County Gas |
0.2 MW | Withdrawn / abandoned |
| Battery storage project 965, Davis County Battery storage |
0.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)302 Β· 46.9 GW
- SPP (Southwest Power Pool)162 Β· 32.0 GW
- MISO (Midcontinent)127 Β· 19.9 GW
- PJM (Mid-Atlantic, Midwest)236 Β· 18.3 GW
- Southeast (non-ISO utilities)208 Β· 16.9 GW
- CAISO (California)65 Β· 11.3 GW
- ERCOT (Texas)55 Β· 8,908 MW
- ISO-NE (New England)42 Β· 4,856 MW
- NYISO (New York)61 Β· 2,565 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)