United States βΊ Grid βΊ Interconnection queues βΊ Washington
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in Washington (2023 requests) β page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Battery storage project G0858, Douglas County Battery storage |
130 MW | In study |
| Battery storage project G0922, Cowlitz County Battery storage |
100 MW | In study |
| Other project 6, Chelan County Other |
100 MW | In study |
| Solar project G1010, Yakima County Solar |
70.0 MW | In study |
| Solar project CS23-13, Lincoln County Solar |
40.0 MW | Agreement signed |
| Solar project CS23-14, Spokane County Solar |
40.0 MW | Agreement signed |
| Battery storage project G0942, Thurston County Battery storage |
20.0 MW | In study |
| Battery storage project G1058, Clark County Battery storage |
20.0 MW | In study |
| Solar project G1004, Franklin County Solar |
10.0 MW | In study |
| Solar project G0957, Benton County Solar |
10.0 MW | In study |
| Solar project G1003, Adams County Solar |
3.0 MW | In study |
| Solar project G0943, Snohomish County Solar |
1.0 MW | In study |
| Solar project G0968, Clark County Solar |
1.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)