United States › Grid › Interconnection queues › Washington
BATTERY STORAGE · WESTBattery storage project G1058, Clark County
Battery storage project G1058, Clark County is a 20.0 MW battery storage request in interconnection study in the West interconnection queue, in Clark County, Washington.
- PlanningQueued Dec 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- G1058
- Grid region
- West (non-ISO utilities)
- Connection point (POI)
- Sifton Substation at 115 kV
- Location
- Clark County, Washington
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- NRIS and ERIS
- Study phase
- In Progress (unknown study)
- Queue status
- Active
- Entered queue
- 13 December 2023
- Proposed online date
- December 2027
Location
Marker shows the centre of Clark County; the queue data does not give exact sites.
Power plants in Washington · Transmission lines in Washington
Other requests in Clark County
- Gas project G1008, Clark CountyGas · 286 MW · in study
- Solar project G1068, Clark CountySolar · 1.0 MW · in study
- Solar project G0968, Clark CountySolar · 1.0 MW · in study
- River Road Generating PlantGas · 240 MW · built
- Ross MHQ Solar ProjectSolar · 1.0 MW · built
- 500MW St Johns-RossGas · 500 MW · withdrawn
- Battery storage project C3-048, Clark CountyBattery storage · 300 MW · withdrawn
- Battery storage project C2-51, Clark CountyBattery storage · 300 MW · withdrawn
- Clark Public UtilitiesGas · 250 MW · withdrawn
- Battery storage project C3-047, Clark CountyBattery storage · 200 MW · withdrawn
- Gas project G28, Clark CountyGas · 100 MW · withdrawn
- Other project 658, Clark CountyOther · 60.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem