United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

GAS Β· WEST

500MW St Johns-Ross

500MW St Johns-Ross is a 500 MW gas request withdrawn in the West interconnection queue, in Clark County, Washington, connecting to Calpine Energy Services, L.P..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2001 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G23
Grid region
West (non-ISO utilities)
Utility / transmission owner
Calpine Energy Services, L.P.
Developer
Calpine Energy Services, L.P.
Connection point (POI)
St. Johns-Ross 230 kV line
Location
Clark County, Washington
Technology
Gas: 500 MW
Total requested
500 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
15 February 2001
Proposed online date
June 2005

Location

Marker shows the centre of Clark County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Clark County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem