United States › Grid › Interconnection queues › Massachusetts
OCTARY USA · INTERCONNECTION QUEUESCompleted queue projects in Massachusetts — page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Treasure Valley substation - NG Western MA Area Cluster Study Solar |
2.2 MW | |
| Cranberry Highway Solar + Battery Storage Solar + storage |
2.2 MW | |
| Kendall Reconfiguration Project Gas |
1.9 MW | |
| Solar Solar |
1.9 MW | |
| MATEP (Combined Cycle) Increase Gas |
1.7 MW | |
| Covanta Haverhill Landfill Gas Other |
1.6 MW | |
| Solar with battery addition Solar + storage |
1.3 MW | |
| Indian River Power Hydro |
1.3 MW | |
| Cresent Hydroelectric Project Uprate Hydro |
0.7 MW | |
| Glendale Hydroelectric Expansion Project Hydro |
0.2 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)