United States › Grid › Interconnection queues › Maine
OCTARY USA · INTERCONNECTION QUEUESCompleted queue projects in Maine — page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Augusta E. Side 115 kV SS - Augusta Area Study Solar |
4.0 MW | |
| Dundee Wind Increase Onshore wind |
3.9 MW | |
| Augusta E. Side 115 kV SS - Augusta Area Study Solar + storage |
3.8 MW | |
| Bowman Street 115 kV SS - Augusta Area Study Solar |
3.3 MW | |
| Wyman Hydro Uprate U1 Hydro |
2.5 MW | |
| Stetson Wind II(Jimmey & Owl Mt.-UPC) Onshore wind |
2.2 MW | |
| Spruce Mountain Wind Increase Onshore wind |
2.0 MW | |
| 13665 Felt Road Solar Solar + storage |
2.0 MW | |
| Rumford Falls Unit #3 increase Hydro |
1.3 MW | |
| Skelton Station Modernization Phase 1 Hydro |
1.1 MW | |
| Gulf Island Unit 1 Increase Hydro |
1.0 MW | |
| Milford Hydro Expansion Increase (Q358) Hydro |
0.2 MW | |
| Rumford Power Repair for Performance Upgrade Gas |
0.2 MW | |
| Pisgah Mountain Increase (see Q349) Onshore wind |
0.1 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)