United States › Grid › Interconnection queues › Missouri
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in Missouri, MISO — page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project J2179, Montgomery County Solar |
100 MW | In study |
| Replacing 95 MW of coal with BESS; Meramec 1, 2, 3, 4 Other |
98.8 MW | In study |
| Hydro project J1213, Iron County Hydro |
60.0 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)53 · 14.8 GW
- SPP (Southwest Power Pool)44 · 8,838 MW
- Southeast (non-ISO utilities)27 · 5,999 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)