United States › Grid › Interconnection queues › Missouri

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in Missouri, MISO — page 2

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5314.8 GW
Active in queue14.8 GW53 requests
Agreement signed3,206 MW10 requests
Withdrawn9218.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

53 requests · page 2 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project J2179, Montgomery County
Solar
100 MWIn study Montgomery, MOMISO Aug 2021target 2024
Replacing 95 MW of coal with BESS; Meramec 1, 2, 3, 4
Other
98.8 MWIn study St. Louis, MOMISO Dec 2024target 2025
Hydro project J1213, Iron County
Hydro
60.0 MWAgreement signed Iron, MOMISO Apr 2019target 2024
Page 2 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)