| Project | Capacity | Status |
|---|---|---|
| MidBishop Solar + storage |
382 MW | In study |
| Brown Bear Solar + storage |
378 MW | In study |
| Circinus Solar + storage |
371 MW | In study |
| Goldlink Solar |
354 MW | In study |
| Bajada Solar |
353 MW | In study |
| Moonraker Battery storage |
353 MW | In study |
| Zama Battery storage |
353 MW | In study |
| Argos Solar Solar |
352 MW | In study |
| Galadriel Battery storage |
318 MW | In study |
| Quaking Aspen Solar + storage |
318 MW | In study |
| Cowboy Solar + storage |
312 MW | In study |
| Mesquite Solar 6 Solar + storage |
309 MW | In study |
| Jackrabbit Power Bank Battery storage |
308 MW | In study |
| Green Palms Solar |
307 MW | In study |
| Serenity Solar |
305 MW | In study |
| Gosford Solar Storage Solar |
305 MW | In study |
| Twinkle Battery storage |
304 MW | In study |
| Shoestring Solar + storage |
270 MW | In study |
| Geras Solar + storage |
268 MW | In study |
| Fika Battery storage |
259 MW | In study |
| Zeitgeist K Energy Center Battery storage |
258 MW | In study |
| Annapurna Battery storage |
257 MW | In study |
| Octans Solar + storage |
207 MW | In study |
| Fornax Solar + storage |
206 MW | In study |
| Rover Battery storage |
206 MW | In study |
| Emerita Energy Storage Battery storage |
206 MW | In study |
| Helios Grid Reliability Battery storage |
206 MW | In study |
| Telluride Solar + storage |
205 MW | In study |
| Cabrera Reliability Battery storage |
205 MW | In study |
| Antlia Battery storage |
205 MW | In study |
| Saguaro Energy Storage Battery storage |
205 MW | In study |
| Mt Baldy Energy Storage 2 Battery storage |
205 MW | In study |
| Container Solar |
205 MW | In study |
| Grapevine 1 Solar |
205 MW | In study |
| Nelson Hills Solar |
205 MW | In study |
| Brundage Energy Storage Battery storage |
202 MW | In study |
| Tendril Solar + storage |
200 MW | In study |
| Conduit Energy Storage 2 Battery storage |
199 MW | In study |
| Lycan Solar 2 Solar |
192 MW | In study |
| Hacienda Solar |
157 MW | In study |
| Argenta Solar |
156 MW | In study |
| Zinfandel Storage Center Battery storage |
154 MW | In study |
| Reflex Solar |
129 MW | In study |
| Holly Oaks Battery storage |
128 MW | In study |
| Bonita Bateria 2 Battery storage |
123 MW | In study |
| Toland Renewable Energy Park Onshore wind |
108 MW | In study |
| Voyager Energy Storage Battery storage |
105 MW | In study |
| Ulua Battery storage |
105 MW | In study |
| Nelson Solar |
104 MW | In study |
| Tioga Pass Battery storage |
103 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)309 Β· 110.9 GW
- ERCOT (Texas)356 Β· 76.0 GW
- CAISO (California)107 Β· 53.4 GW
- Southeast (non-ISO utilities)210 Β· 24.0 GW
- SPP (Southwest Power Pool)82 Β· 15.1 GW
- PJM (Mid-Atlantic, Midwest)156 Β· 14.6 GW
- MISO (Midcontinent)23 Β· 3,679 MW
- ISO-NE (New England)6 Β· 1,053 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)