Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown10753.4 GW
Active in queue53.4 GW107 requests
Agreement signed0.0 MW0 requests
Withdrawn486198.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

107 requests Β· page 2 of 3
ProjectCapacityStatusLocationRegionQueuedOnline
MidBishop
Solar + storage
382 MWIn study Kings, CACAISO Apr 2023target 2029
Brown Bear
Solar + storage
378 MWIn study Kings, CACAISO Apr 2023target 2029
Circinus
Solar + storage
371 MWIn study Merced, CACAISO Apr 2023target 2031
Goldlink
Solar
354 MWIn study Nye, NVCAISO Apr 2023target 2030
Bajada
Solar
353 MWIn study Riverside, CACAISO Apr 2023target 2030
Moonraker
Battery storage
353 MWIn study Kern, CACAISO Apr 2023target 2029
Zama
Battery storage
353 MWIn study Kern, CACAISO Apr 2023target 2029
Argos Solar
Solar
352 MWIn study San Bernardino, CACAISO Apr 2023target 2030
Galadriel
Battery storage
318 MWIn study Madera, CACAISO Apr 2023target 2031
Quaking Aspen
Solar + storage
318 MWIn study Kern, CACAISO Apr 2023target 2029
Cowboy
Solar + storage
312 MWIn study Colusa, CACAISO Apr 2023target 2030
Mesquite Solar 6
Solar + storage
309 MWIn study Maricopa, AZCAISO Apr 2023target 2028
Jackrabbit Power Bank
Battery storage
308 MWIn study Santa Clara, CACAISO Apr 2023target 2029
Green Palms
Solar
307 MWIn study Riverside, CACAISO Apr 2023target 2030
Serenity
Solar
305 MWIn study Nye, NVCAISO Apr 2023target 2031
Gosford Solar Storage
Solar
305 MWIn study Kern, CACAISO Apr 2023target 2029
Twinkle
Battery storage
304 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Shoestring
Solar + storage
270 MWIn study Fresno, CACAISO Apr 2023target 2031
Geras
Solar + storage
268 MWIn study Stanislaus, CACAISO Apr 2023target 2028
Fika
Battery storage
259 MWIn study Merced, CACAISO Apr 2023target 2029
Zeitgeist K Energy Center
Battery storage
258 MWIn study San Joaquin, CACAISO Apr 2023target 2030
Annapurna
Battery storage
257 MWIn study Merced, CACAISO Apr 2023target 2028
Octans
Solar + storage
207 MWIn study Fresno, CACAISO Apr 2023target 2031
Fornax
Solar + storage
206 MWIn study Fresno, CACAISO Apr 2023target 2031
Rover
Battery storage
206 MWIn study Los Angeles, CACAISO Apr 2023target 2028
Emerita Energy Storage
Battery storage
206 MWIn study Alameda, CACAISO Apr 2023target 2028
Helios Grid Reliability
Battery storage
206 MWIn study Calaveras, CACAISO Apr 2023target 2028
Telluride
Solar + storage
205 MWIn study Fresno, CACAISO Apr 2023target 2030
Cabrera Reliability
Battery storage
205 MWIn study San Bernardino, CACAISO Apr 2023target 2028
Antlia
Battery storage
205 MWIn study Monterey, CACAISO Apr 2023target 2031
Saguaro Energy Storage
Battery storage
205 MWIn study San Bernardino, CACAISO Apr 2023target 2029
Mt Baldy Energy Storage 2
Battery storage
205 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Container
Solar
205 MWIn study Nye, NVCAISO Apr 2023target 2031
Grapevine 1
Solar
205 MWIn study Nye, NVCAISO Apr 2023target 2031
Nelson Hills
Solar
205 MWIn study Nye, NVCAISO Apr 2023target 2031
Brundage Energy Storage
Battery storage
202 MWIn study Los Angeles, CACAISO Apr 2023target 2029
Tendril
Solar + storage
200 MWIn study Kern, CACAISO Apr 2023target 2031
Conduit Energy Storage 2
Battery storage
199 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Lycan Solar 2
Solar
192 MWIn study Riverside, CACAISO Apr 2023target 2028
Hacienda
Solar
157 MWIn study San Bernardino, CACAISO Apr 2023target 2030
Argenta
Solar
156 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Zinfandel Storage Center
Battery storage
154 MWIn study San Joaquin, CACAISO Apr 2023target 2030
Reflex
Solar
129 MWIn study Riverside, CACAISO Apr 2023target 2029
Holly Oaks
Battery storage
128 MWIn study Calaveras, CACAISO Apr 2023target 2028
Bonita Bateria 2
Battery storage
123 MWIn study Orange, CACAISO Apr 2023target 2029
Toland Renewable Energy Park
Onshore wind
108 MWIn study Solano, CACAISO Apr 2023target 2029
Voyager Energy Storage
Battery storage
105 MWIn study Kern, CACAISO Apr 2023target 2027
Ulua
Battery storage
105 MWIn study Los Angeles, CACAISO Apr 2023target 2029
Nelson
Solar
104 MWIn study Nye, NVCAISO Apr 2023target 2031
Tioga Pass
Battery storage
103 MWIn study San Joaquin, CACAISO Apr 2023target 2028

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)