United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in CAISO (California) — page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| East Wonder Solar + storage |
556 MW | In study |
| Sagebrush Energy Storage Battery storage |
528 MW | In study |
| Summit Valley Energy Storage Battery storage |
519 MW | In study |
| Lupine Energy Center Battery storage |
518 MW | In study |
| Chronos Energy Storage Battery storage |
517 MW | In study |
| Yacht Rock Battery storage |
514 MW | In study |
| Dove Cove Battery storage |
514 MW | In study |
| Belterra Energy Storage Battery storage |
514 MW | In study |
| Fontus Battery storage |
514 MW | In study |
| Blue Star Solar + storage |
513 MW | In study |
| Rosa Storage Battery storage |
512 MW | In study |
| Bolt Solar + storage |
509 MW | In study |
| Torbino Solar Solar |
507 MW | In study |
| Galicia Storage Battery storage |
506 MW | In study |
| Ambar Energy Storage Battery storage |
505 MW | In study |
| Sterling Solar + storage |
500 MW | In study |
| Vulcan Solar + storage |
500 MW | In study |
| Hawkins Solar Hybrid Solar + storage |
500 MW | In study |
| Cantus Solar + storage |
499 MW | In study |
| Corby 2 Battery storage |
476 MW | In study |
| Shoals Energy Storage 2 Battery storage |
461 MW | In study |
| Mineral King Solar Solar + storage |
430 MW | In study |
| Boulder Brush Hybrid Wind + storage |
420 MW | In study |
| Tolenas Battery storage |
417 MW | In study |
| Alisa Solar Energy Complex Solar + storage |
417 MW | In study |
| Whiskey Diggings Solar |
414 MW | In study |
| Solstice C Solar + storage |
408 MW | In study |
| Solstice D Solar + storage |
408 MW | In study |
| Maravillosa 1 Solar + storage |
407 MW | In study |
| Lotus Solar 2 Solar + storage |
406 MW | In study |
| Simon Battery storage |
406 MW | In study |
| Coral Reef Battery storage |
406 MW | In study |
| Fleetwood Battery storage |
406 MW | In study |
| Tea Leaf Energy Storage Battery storage |
404 MW | In study |
| Dirac Battery storage |
403 MW | In study |
| Gamay Solar + storage |
400 MW | In study |
| Sequoia Solar + storage |
400 MW | In study |
| Brushy Battery storage |
400 MW | In study |
| Comstock Gas |
398 MW | In study |
| MidBishop Solar + storage |
382 MW | In study |
| Brown Bear Solar + storage |
378 MW | In study |
| Circinus Solar + storage |
371 MW | In study |
| Northeast Central Valley Battery storage |
365 MW | In study |
| Goldlink Solar |
354 MW | In study |
| Bajada Solar |
353 MW | In study |
| Moonraker Battery storage |
353 MW | In study |
| Zama Battery storage |
353 MW | In study |
| Argos Solar Solar |
352 MW | In study |
| Dandelion Hybrid Solar Solar + storage |
334 MW | In study |
| Harquahala Sunrise 2 Solar + storage |
330 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)