🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Queue requests in study in CAISO (California) — page 2

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown19492.4 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

194 requests · page 2 of 4
ProjectCapacityStatusLocationRegionQueuedOnline
East Wonder
Solar + storage
556 MWIn study Kern, CACAISO Apr 2023target 2029
Sagebrush Energy Storage
Battery storage
528 MWIn study Kern, CACAISO Apr 2021target 2033
Summit Valley Energy Storage
Battery storage
519 MWIn study San Bernardino, CACAISO Apr 2023target 2032
Lupine Energy Center
Battery storage
518 MWIn study San Bernardino, CACAISO Apr 2023target 2030
Chronos Energy Storage
Battery storage
517 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Yacht Rock
Battery storage
514 MWIn study San Bernardino, CACAISO Apr 2023target 2028
Dove Cove
Battery storage
514 MWIn study San Joaquin, CACAISO Apr 2023target 2031
Belterra Energy Storage
Battery storage
514 MWIn study Calaveras, CACAISO Apr 2023target 2028
Fontus
Battery storage
514 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Blue Star
Solar + storage
513 MWIn study Kings, CACAISO Apr 2023target 2029
Rosa Storage
Battery storage
512 MWIn study Ventura, CACAISO Apr 2021target 2034
Bolt
Solar + storage
509 MWIn study Fresno, CACAISO Apr 2023target 2031
Torbino Solar
Solar
507 MWIn study Kern, CACAISO Apr 2023target 2029
Galicia Storage
Battery storage
506 MWIn study San Bernardino, CACAISO Apr 2023target 2028
Ambar Energy Storage
Battery storage
505 MWIn study San Bernardino, CACAISO Apr 2023target 2030
Sterling
Solar + storage
500 MWIn study Clark, NVCAISO Apr 2021target 2031
Vulcan
Solar + storage
500 MWIn study Maricopa, AZCAISO Apr 2018target 2027
Hawkins Solar Hybrid
Solar + storage
500 MWIn study Kern, CACAISO Apr 2020target 2027
Cantus
Solar + storage
499 MWIn study Merced, CACAISO Apr 2023target 2031
Corby 2
Battery storage
476 MWIn study Solano, CACAISO Apr 2021target 2031
Shoals Energy Storage 2
Battery storage
461 MWIn study Los Angeles, CACAISO Apr 2023target 2029
Mineral King Solar
Solar + storage
430 MWIn study Tulare, CACAISO Apr 2021target 2029
Boulder Brush Hybrid
Wind + storage
420 MWIn study San Diego, CACAISO Apr 2021target 2031
Tolenas
Battery storage
417 MWIn study Solano, CACAISO Apr 2021target 2031
Alisa Solar Energy Complex
Solar + storage
417 MWIn study Yuma, AZCAISO Apr 2021target 2028
Whiskey Diggings
Solar
414 MWIn study Sutter, CACAISO Apr 2023target 2030
Solstice C
Solar + storage
408 MWIn study Fresno, CACAISO Apr 2023target 2031
Solstice D
Solar + storage
408 MWIn study Fresno, CACAISO Apr 2023target 2031
Maravillosa 1
Solar + storage
407 MWIn study Kings, CACAISO Apr 2023target 2029
Lotus Solar 2
Solar + storage
406 MWIn study Madera, CACAISO Apr 2021target 2030
Simon
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Coral Reef
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Fleetwood
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Tea Leaf Energy Storage
Battery storage
404 MWIn study Alameda, CACAISO Apr 2023target 2030
Dirac
Battery storage
403 MWIn study San Bernardino, CACAISO Apr 2021target 2031
Gamay
Solar + storage
400 MWIn study Kern, CACAISO Apr 2023target 2031
Sequoia
Solar + storage
400 MWIn study Tulare, CACAISO Apr 2020target 2031
Brushy
Battery storage
400 MWIn study Solano, CACAISO Apr 2021target 2031
Comstock
Gas
398 MWIn study San Bernardino, CACAISO Apr 2023target 2028
MidBishop
Solar + storage
382 MWIn study Kings, CACAISO Apr 2023target 2029
Brown Bear
Solar + storage
378 MWIn study Kings, CACAISO Apr 2023target 2029
Circinus
Solar + storage
371 MWIn study Merced, CACAISO Apr 2023target 2031
Northeast Central Valley
Battery storage
365 MWIn study San Joaquin, CACAISO Apr 2021target 2031
Goldlink
Solar
354 MWIn study Nye, NVCAISO Apr 2023target 2030
Bajada
Solar
353 MWIn study Riverside, CACAISO Apr 2023target 2030
Moonraker
Battery storage
353 MWIn study Kern, CACAISO Apr 2023target 2029
Zama
Battery storage
353 MWIn study Kern, CACAISO Apr 2023target 2029
Argos Solar
Solar
352 MWIn study San Bernardino, CACAISO Apr 2023target 2030
Dandelion Hybrid Solar
Solar + storage
334 MWIn study Nye, NVCAISO Apr 2021target 2027
Harquahala Sunrise 2
Solar + storage
330 MWIn study Maricopa, AZCAISO Apr 2021target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)