Interconnection queue in California, CAISO — page 2

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown376148.9 GW
Active in queue148.9 GW376 requests
Agreement signed81.1 GW213 requests
Withdrawn2,050551.7 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

376 requests · page 2 of 8
ProjectCapacityStatusLocationRegionQueuedOnline
Kingsley Solar Farm
Solar + storage
720 MWAgreement signed Imperial, CACAISO Apr 2019target 2030
Buttonbush Solar 2
Solar + storage
716 MWAgreement signed Kern, CACAISO Apr 2021target 2032
Presidio
Solar + storage
713 MWAgreement signed San Joaquin, CACAISO Apr 2021target 2030
Sanborn Solar 2
Solar + storage
707 MWAgreement signed Kern, CACAISO Apr 2018target 2025
Menifee Power Bank
Battery storage
680 MWAgreement signed Riverside, CACAISO Apr 2019target 2025
Steel City Battery Storage
Battery storage
675 MWAgreement signed Contra Costa, CACAISO Apr 2020target 2029
Sunrise Power Improvement
Gas
656 MWIn study Kern, CACAISO Apr 2020target 2024
Yuha Desert Battery Storage
Battery storage
633 MWIn study Imperial, CACAISO Apr 2021target 2031
Cady Solar
Solar + storage
626 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2031
Cherry Lane Hybrid
Solar + storage
621 MWIn study Kern, CACAISO Apr 2021target 2031
Willow Rock Energy Storage
Other
620 MWAgreement signed Kern, CACAISO Apr 2020target 2030
Australis
Solar + storage
614 MWAgreement signed Merced, CACAISO Apr 2021target 2031
Sunvine
Solar + storage
614 MWIn study Kern, CACAISO Apr 2023target 2031
Daylight
Solar + storage
611 MWAgreement signed Kings, CACAISO May 2016target 2028
Maestro
Solar + storage
609 MWIn study Fresno, CACAISO Apr 2023target 2029
Cornucopia Hybrid
Solar + storage
605 MWAgreement signed Fresno, CACAISO Apr 2021target 2030
Duran
Gas
600 MWIn study San Bernardino, CACAISO Apr 2023target 2028
Soleil Cantil
Solar + storage
597 MWIn study Kern, CACAISO Apr 2021target 2033
Twin Palms Solar
Solar + storage
576 MWAgreement signed Riverside, CACAISO Apr 2021target 2030
Sienna 3
Solar + storage
576 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Soledad Solar
Solar
562 MWIn study Kern, CACAISO Apr 2023target 2028
Sanborn 5 Hybrid
Solar
560 MWAgreement signed Kern, CACAISO Apr 2020target 2027
East Wonder
Solar + storage
556 MWIn study Kern, CACAISO Apr 2023target 2029
Rosamond West Solar
Solar + storage
555 MWAgreement signed Kern, CACAISO Jul 2009target 2029
Redonda
Solar + storage
542 MWAgreement signed Riverside, CACAISO Apr 2021target 2031
Sagebrush Energy Storage
Battery storage
528 MWIn study Kern, CACAISO Apr 2021target 2033
Daggett Solar 3
Solar + storage
522 MWAgreement signed San Bernardino, CACAISO May 2016target 2023
Summit Valley Energy Storage
Battery storage
519 MWIn study San Bernardino, CACAISO Apr 2023target 2032
Lupine Energy Center
Battery storage
518 MWIn study San Bernardino, CACAISO Apr 2023target 2030
Chronos Energy Storage
Battery storage
517 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Alta Casa Storage
Battery storage
515 MWAgreement signed San Joaquin, CACAISO Apr 2021target 2031
Yacht Rock
Battery storage
514 MWIn study San Bernardino, CACAISO Apr 2023target 2028
Dove Cove
Battery storage
514 MWIn study San Joaquin, CACAISO Apr 2023target 2031
Belterra Energy Storage
Battery storage
514 MWIn study Calaveras, CACAISO Apr 2023target 2028
Fontus
Battery storage
514 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Blue Star
Solar + storage
513 MWIn study Kings, CACAISO Apr 2023target 2029
Greasewood Energy Storage
Battery storage
513 MWAgreement signed Kern, CACAISO Apr 2021target 2033
Cobalt
Solar + storage
513 MWAgreement signed Riverside, CACAISO Apr 2020target 2027
Conduit Energy Storage
Battery storage
513 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2031
Rosa Storage
Battery storage
512 MWIn study Ventura, CACAISO Apr 2021target 2034
Bolt
Solar + storage
509 MWIn study Fresno, CACAISO Apr 2023target 2031
Lock Storage
Battery storage
508 MWAgreement signed Fresno, CACAISO Apr 2021target 2027
Double Butte Storage
Battery storage
508 MWAgreement signed Riverside, CACAISO Apr 2019target 2030
Torbino Solar
Solar
507 MWIn study Kern, CACAISO Apr 2023target 2029
Galicia Storage
Battery storage
506 MWIn study San Bernardino, CACAISO Apr 2023target 2028
Ambar Energy Storage
Battery storage
505 MWIn study San Bernardino, CACAISO Apr 2023target 2030
Drifter Energy Storage
Battery storage
505 MWAgreement signed Ventura, CACAISO Apr 2021target 2033
Ocotillo Express
Wind + storage
504 MWAgreement signed Imperial, CACAISO Jul 20092013
Spectrum Energy Storage
Battery storage
504 MWAgreement signed Alameda, CACAISO Apr 2021target 2032
Delilah Energy Storage
Battery storage
504 MWAgreement signed Contra Costa, CACAISO Apr 2021target 2032

Capacity in the queue by state

Click a state to drill down.

By grid region

ISO/RTO markets and the non-ISO West and Southeast.

Requests by year joined

Capacity of requests in this view, by the year they entered the queue. Click a year.

20102023

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)