United States › Grid › Interconnection queues › California
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in California, CAISO — page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Kingsley Solar Farm Solar + storage |
720 MW | Agreement signed |
| Buttonbush Solar 2 Solar + storage |
716 MW | Agreement signed |
| Presidio Solar + storage |
713 MW | Agreement signed |
| Sanborn Solar 2 Solar + storage |
707 MW | Agreement signed |
| Menifee Power Bank Battery storage |
680 MW | Agreement signed |
| Steel City Battery Storage Battery storage |
675 MW | Agreement signed |
| Sunrise Power Improvement Gas |
656 MW | In study |
| Yuha Desert Battery Storage Battery storage |
633 MW | In study |
| Cady Solar Solar + storage |
626 MW | Agreement signed |
| Cherry Lane Hybrid Solar + storage |
621 MW | In study |
| Willow Rock Energy Storage Other |
620 MW | Agreement signed |
| Australis Solar + storage |
614 MW | Agreement signed |
| Sunvine Solar + storage |
614 MW | In study |
| Daylight Solar + storage |
611 MW | Agreement signed |
| Maestro Solar + storage |
609 MW | In study |
| Cornucopia Hybrid Solar + storage |
605 MW | Agreement signed |
| Duran Gas |
600 MW | In study |
| Soleil Cantil Solar + storage |
597 MW | In study |
| Twin Palms Solar Solar + storage |
576 MW | Agreement signed |
| Sienna 3 Solar + storage |
576 MW | In study |
| Soledad Solar Solar |
562 MW | In study |
| Sanborn 5 Hybrid Solar |
560 MW | Agreement signed |
| East Wonder Solar + storage |
556 MW | In study |
| Rosamond West Solar Solar + storage |
555 MW | Agreement signed |
| Redonda Solar + storage |
542 MW | Agreement signed |
| Sagebrush Energy Storage Battery storage |
528 MW | In study |
| Daggett Solar 3 Solar + storage |
522 MW | Agreement signed |
| Summit Valley Energy Storage Battery storage |
519 MW | In study |
| Lupine Energy Center Battery storage |
518 MW | In study |
| Chronos Energy Storage Battery storage |
517 MW | In study |
| Alta Casa Storage Battery storage |
515 MW | Agreement signed |
| Yacht Rock Battery storage |
514 MW | In study |
| Dove Cove Battery storage |
514 MW | In study |
| Belterra Energy Storage Battery storage |
514 MW | In study |
| Fontus Battery storage |
514 MW | In study |
| Blue Star Solar + storage |
513 MW | In study |
| Greasewood Energy Storage Battery storage |
513 MW | Agreement signed |
| Cobalt Solar + storage |
513 MW | Agreement signed |
| Conduit Energy Storage Battery storage |
513 MW | Agreement signed |
| Rosa Storage Battery storage |
512 MW | In study |
| Bolt Solar + storage |
509 MW | In study |
| Lock Storage Battery storage |
508 MW | Agreement signed |
| Double Butte Storage Battery storage |
508 MW | Agreement signed |
| Torbino Solar Solar |
507 MW | In study |
| Galicia Storage Battery storage |
506 MW | In study |
| Ambar Energy Storage Battery storage |
505 MW | In study |
| Drifter Energy Storage Battery storage |
505 MW | Agreement signed |
| Ocotillo Express Wind + storage |
504 MW | Agreement signed |
| Spectrum Energy Storage Battery storage |
504 MW | Agreement signed |
| Delilah Energy Storage Battery storage |
504 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)