OCTARY USA · INTERCONNECTION QUEUESCompleted queue projects in MISO (Midcontinent) — page 11
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Other project G140, Nobles County Other |
2.0 MW | |
| Other project G270, Nobles County Other |
2.0 MW | |
| Other project G142, Nobles County Other |
2.0 MW | |
| Onshore wind project G398, Pipestone County Onshore wind |
2.0 MW | |
| Onshore wind project G385, Nobles County Onshore wind |
2.0 MW | |
| Solar project J1183, Delta County Solar |
1.4 MW | |
| Onshore wind project G073, Lincoln County Onshore wind |
1.0 MW | |
| Onshore wind project G340, Lincoln County Onshore wind |
1.0 MW | |
| Onshore wind project G481, Rolette County Onshore wind |
1.0 MW | |
| Solar project J554, Dodge County Solar |
1.0 MW | |
| Hydro project G938, Newaygo County Hydro |
1.0 MW | |
| Hydro project G562, Eau Claire County Hydro |
1.0 MW | |
| Solar project J557, Delta County Solar |
0.9 MW | |
| Coal project G920, St. Charles County Coal |
-15.0 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- Southeast (non-ISO utilities)529 · 112.4 GW
- PJM (Mid-Atlantic, Midwest)1,192 · 97.6 GW
- ERCOT (Texas)613 · 95.3 GW
- MISO (Midcontinent)514 · 69.7 GW
- West (non-ISO utilities)963 · 64.7 GW
- SPP (Southwest Power Pool)299 · 45.1 GW
- CAISO (California)234 · 37.6 GW
- NYISO (New York)215 · 24.8 GW
- ISO-NE (New England)228 · 16.5 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)