Completed queue projects in MISO (Midcontinent) — page 11

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown51469.7 GW
Active in queue350.1 GW1,646 requests
Agreement signed28.1 GW187 requests
Withdrawn3,261621.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

514 requests · page 11 of 11
ProjectCapacityStatusLocationRegionQueuedOnline
Other project G140, Nobles County
Other
2.0 MWOperating Nobles, MNMISO Oct 2001
Other project G270, Nobles County
Other
2.0 MWOperating Nobles, MNMISO Dec 20022005
Other project G142, Nobles County
Other
2.0 MWOperating Nobles, MNMISO Oct 20012001
Onshore wind project G398, Pipestone County
Onshore wind
2.0 MWOperating Pipestone, MNMISO Jan 20042010
Onshore wind project G385, Nobles County
Onshore wind
2.0 MWOperating Nobles, MNMISO Nov 20032004
Solar project J1183, Delta County
Solar
1.4 MWOperating Delta, MIMISO Mar 20182019
Onshore wind project G073, Lincoln County
Onshore wind
1.0 MWOperating Lincoln, MNMISO Jan 20012004
Onshore wind project G340, Lincoln County
Onshore wind
1.0 MWOperating Lincoln, MNMISO May 20032006
Onshore wind project G481, Rolette County
Onshore wind
1.0 MWOperating Rolette, NDMISO Nov 20042007
Solar project J554, Dodge County
Solar
1.0 MWOperating Dodge, MNMISO Mar 20162016
Hydro project G938, Newaygo County
Hydro
1.0 MWOperating Newaygo, MIMISO Dec 20072010
Hydro project G562, Eau Claire County
Hydro
1.0 MWOperating Eau Claire, WIMISO Nov 20052007
Solar project J557, Delta County
Solar
0.9 MWOperating Delta, MIMISO Apr 20162016
Coal project G920, St. Charles County
Coal
-15.0 MWOperating St. Charles, MOMISO Nov 20072011
Page 11 of 11

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)