Mynydd Gorddu
Mynydd Gorddu is a 10.2 MW onshore wind farm in Wales, operated by Venitent Energy Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Wales
Key facts
- Installed capacity
- 10.2 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Venitent Energy Services
- Region
- Wales
- Country
- Wales
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- SY24 5DP
- Coordinates
- 52.4663, -3.9710
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Mynydd Gorddu compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 10.2 MW station would generate roughly 23 GWh of electricity in a year, similar to the annual use of about 8,600 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Wales All run by Venitent Energy ServicesNearby generating sites
- Rheidol Hydro Scheme Gen 1 Β· 13.5 MW hydroelectric station9.1 km
- Rheidol Hydro Scheme Gen 4 Β· 1.25 MW small hydro scheme9.1 km
- Rheidol Hydro Scheme Gen 7 Β· 0.1 MW small hydro scheme9.1 km
- Rheidol Β· 2.4 MW onshore wind farm9.1 km
- Rheidol Hydro Scheme Gen 3 Β· 20.5 MW hydroelectric station9.3 km
- Rheidol Hydro Scheme Gen 2 Β· 20.5 MW hydroelectric station9.3 km
- Rheidol Hydro Scheme Gen 6 Β· 0.05 MW small hydro scheme9.3 km
- Rheidol Hydro Scheme Gen 5 Β· 0.08 MW small hydro scheme9.7 km
Also operated by Venitent Energy Services
Venitent Energy Services operates 33 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Mynydd Gorddu Wind Farm
- Developer / operator
- Cynllun Trydan Gwynt
- Planning authority
- Ceredigion
- Application submitted
- 4 January 1991
- Permission granted
- 12 September 1991
- Began operating
- 18 April 1998
- Capacity in planning record
- 10.2 MW
- Address
- Mynydd Gorddu Elerch Tal-y-Bont Dyfed, Dyfed
- REPD reference
- 2559
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.