Hywind BMU 1

Hywind BMU 1 is a 30 MW offshore wind farm in Scotland, operated by Scira Offshore Energy. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Offshore
  • Scotland
Project stageOperating
  1. PlanningMar 2015 (completed)
  2. ConsentedOct 2015 (completed)
  3. ConstructionApr 2017 (completed)
  4. OperatingOct 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
30 MW
Status
Operational
Technology
Wind Β· Offshore
Operator
Scira Offshore Energy
Region
Scotland
Country
Scotland
Grid connection (DUKES)
HV
Combined heat & power
No
Coordinates
57.5075, -1.4426

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Hywind BMU 1 compares

160th of 488largest wind farms in the UK register
94th of 199in Scotland
0.10%of listed UK wind farms capacity
β‰ˆ 100 GWhillustrative output a year

At a typical UK load factor for this technology (about 38% of the maximum possible output), a 30 MW station would generate roughly 100 GWh of electricity in a year, similar to the annual use of about 36,990 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Scira Offshore Energy

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Hywind Scotland Pilot Park (Hywind 2) Demonstrator
Developer / operator
Statoil
Planning authority
Marine Scotland
Application submitted
27 March 2015
Permission granted
30 October 2015
Construction started
27 April 2017
Began operating
27 October 2017
Capacity in planning record
30 MW
Address
Buchan Deeps, 20km off Peterhead, Offshore
REPD reference
2479

Full project profile β†’

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.