πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
WIND Β· OPERATIONAL

Freasdail (GB)

Freasdail (GB) is a 22.5 MW onshore wind farm in Scotland, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningOct 2012 (completed)
  2. ConsentedApr 2014 (completed)
  3. ConstructionFeb 2016 (completed)
  4. OperatingFeb 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
22.5 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RES Group
Region
Scotland
Country
Scotland
Grid connection (DUKES)
HV
Combined heat & power
No
Postcode
PA29 6XR
Coordinates
55.7902, -5.4992

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Freasdail (GB) compares

208th of 488largest wind farms in the UK register
126th of 199in Scotland
0.08%of listed UK wind farms capacity
β‰ˆ 51 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 22.5 MW station would generate roughly 51 GWh of electricity in a year, similar to the annual use of about 18,980 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Freasdail Wind Farm
Developer / operator
The Renewables Infrastructure Group (TRIG)
Planning authority
Argyll and Bute
Planning reference
12/02150/PP
Application submitted
25 October 2012
Permission granted
15 April 2014
Construction started
20 February 2016
Began operating
8 February 2017
Capacity in planning record
22.5 MW
Address
Land East Of Loch Freasdail And North Of Loch Cruinn Whitehouse By Tarbert Argyll And Bute, Strathclyde
REPD reference
3886

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.