Cour Wind Farm
Cour Wind Farm is a 20.5 MW onshore wind farm in Scotland, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 20.5 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- RES Group
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Postcode
- PA28 6QL
- Coordinates
- 55.6807, -5.4849
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Cour Wind Farm compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 20.5 MW station would generate roughly 47 GWh of electricity in a year, similar to the annual use of about 17,290 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by RES GroupNearby generating sites
- Deucheran Hill (RO) Β· 15.8 MW onshore wind farm6.8 km
- Beinn an Tuirc III Β· 50 MW onshore wind farm9.8 km
- Freasdail (GB) Β· 22.5 MW onshore wind farm12.2 km
- Beinn an Tuirc I Β· 29.7 MW onshore wind farm13.6 km
- Beinn an Tuirc II Β· 43.7 MW onshore wind farm13.6 km
- Blary Hill Β· 35 MW onshore wind farm15.8 km
- Lussa Power Station - A Β· 2.4 MW small hydro scheme23.2 km
- Tangy Wind Farm - A Β· 18.5 MW onshore wind farm26.0 km
Also operated by RES Group
RES Group operates 98 sites in the register. Largest first:
- Beinneun Wind Farm Β· onshore wind farm109 MW
- Cumberhead Wind Farm Β· onshore wind farm50 MW
- Hill of Towie Wind Farm (GB) Β· onshore wind farm48.3 MW
- Crossdykes Wind Farm Β· onshore wind farm48 MW
- Blary Hill Β· onshore wind farm35 MW
- Tormywheel Β· onshore wind farm30.8 MW
- Garreg Llwyd (GB) Β· onshore wind farm30.4 MW
- Solwaybank Β· onshore wind farm30.4 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- Octopus Investments/Blue Energy
- Planning authority
- Argyll and Bute
- Planning reference
- 10/00909/PP
- Application submitted
- 21 May 2010
- Permission granted
- 17 October 2012
- Construction started
- 19 November 2015
- Began operating
- 1 December 2016
- Capacity in planning record
- 20.5 MW
- Address
- Carradale Argyll And Bute, Strathclyde
- REPD reference
- 3772
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.