πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
WIND Β· OPERATIONAL

Beinn an Tuirc I

Beinn an Tuirc I is a 29.7 MW onshore wind farm in Scotland, operated by Scottish Power. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningApr 1998 (completed)
  2. ConsentedApr 1999 (completed)
  3. Construction (completed)
  4. OperatingDec 2001 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
29.7 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Scottish Power
Region
Scotland
Country
Scotland
Grid connection (DUKES)
HV
Combined heat & power
No
Postcode
PA28 6QY
Coordinates
55.5732, -5.5874

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Beinn an Tuirc I compares

172nd of 488largest wind farms in the UK register
104th of 199in Scotland
0.10%of listed UK wind farms capacity
β‰ˆ 68 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 29.7 MW station would generate roughly 68 GWh of electricity in a year, similar to the annual use of about 25,050 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Scottish Power

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Beinn an Tuirc
Developer / operator
CRE Energy/ Scottish Power
Planning authority
Argyll and Bute
Application submitted
20 April 1998
Permission granted
28 April 1999
Began operating
23 December 2001
Capacity in planning record
29.7 MW
Address
Nr. Carradale, Strathclyde
REPD reference
3292

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.