WIND Β· OPERATIONAL

Dunsland Cross

Dunsland Cross is a 6.15 MW onshore wind farm in South West England, operated by Temporis Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • South West
  • England
Project stageOperating
  1. PlanningJan 2012 (completed)
  2. ConsentedJan 2013 (completed)
  3. ConstructionJan 2016 (completed)
  4. OperatingMar 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
6.15 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Temporis Capital
Region
South West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
EX22 7AW
Coordinates
50.8431, -4.2450

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Dunsland Cross compares

389th of 488largest wind farms in the UK register
10th of 19in South West
0.02%of listed UK wind farms capacity
β‰ˆ 14 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 6.15 MW station would generate roughly 14 GWh of electricity in a year, similar to the annual use of about 5,190 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in South West All run by Temporis Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Dunsland Cross Wind Farm
Developer / operator
Temporis Capital
Planning authority
Torridge
Planning reference
1/1250/2011/FULM
Application submitted
13 January 2012
Permission granted
22 January 2013
Construction started
29 January 2016
Began operating
8 March 2017
Capacity in planning record
7.5 MW
Address
Land At Dunsland Cross South Of Brandis Corner Holsworthy Devon EX22 7YH, Devon
REPD reference
4227

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source