Dunsland Cross
Dunsland Cross is a 6.15 MW onshore wind farm in South West England, operated by Temporis Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- South West
- England
Key facts
- Installed capacity
- 6.15 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Temporis Capital
- Region
- South West
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- EX22 7AW
- Coordinates
- 50.8431, -4.2450
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Dunsland Cross compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 6.15 MW station would generate roughly 14 GWh of electricity in a year, similar to the annual use of about 5,190 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in South West All run by Temporis CapitalNearby generating sites
- Southcombe Farm Β· 1.21 MW solar farm5.2 km
- Bulkworthy Solar Β· 6.24 MW solar farm7.7 km
- Willsland Β· 3.27 MW solar farm8.6 km
- Galsworthy Β· 9.2 MW onshore wind farm8.9 km
- Derriton (Tamar Heights) Β· 11.7 MW solar farm9.7 km
- Eastacombe Β· 3.58 MW solar farm10.1 km
- Great Knowles Β· 2.92 MW solar farm10.2 km
- Whiddon Farm Β· 0.9 MW solar farm10.3 km
Also operated by Temporis Capital
Temporis Capital operates 20 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Dunsland Cross Wind Farm
- Developer / operator
- Temporis Capital
- Planning authority
- Torridge
- Planning reference
- 1/1250/2011/FULM
- Application submitted
- 13 January 2012
- Permission granted
- 22 January 2013
- Construction started
- 29 January 2016
- Began operating
- 8 March 2017
- Capacity in planning record
- 7.5 MW
- Address
- Land At Dunsland Cross South Of Brandis Corner Holsworthy Devon EX22 7YH, Devon
- REPD reference
- 4227
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026