WIND Β· OPERATIONAL

Callagheen

Callagheen is a 16.9 MW onshore wind farm in Northern Ireland, operated by Scottish Power. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Northern Ireland
Project stageOperating
  1. PlanningDec 2007 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
16.9 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Scottish Power
Region
Northern Ireland
Country
Northern Ireland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
BT93 4AL
Coordinates
54.4363, -8.0050

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Callagheen compares

250th of 488largest wind farms in the UK register
15th of 32in Northern Ireland
0.06%of listed UK wind farms capacity
β‰ˆ 38 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 16.9 MW station would generate roughly 38 GWh of electricity in a year, similar to the annual use of about 14,260 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Northern Ireland All run by Scottish Power

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Planning Application Withdrawn
Site name in planning record
Callagheen Ext
Developer / operator
Scottish Power Renewables
Planning authority
Fermanagh and Omagh
Planning reference
L/2007/1772/F
Application submitted
15 December 2007
Capacity in planning record
13.8 MW
Address
Killy Beg and Killy More Townlands (to the south side of public road from existing Callagheen wind farm), Co. Fermanagh
REPD reference
2716

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.