Church Hill

Church Hill is a 18.4 MW onshore wind farm in Northern Ireland, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Northern Ireland
Project stageOperating
  1. PlanningApr 2005 (completed)
  2. ConsentedApr 2007 (completed)
  3. ConstructionMay 2011 (completed)
  4. OperatingJun 2012 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
18.4 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Greencoat Capital
Region
Northern Ireland
Country
Northern Ireland
Grid connection (DUKES)
LV
Combined heat & power
No
Coordinates
54.6540, -7.7128

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Church Hill compares

237th of 488largest wind farms in the UK register
13th of 32in Northern Ireland
0.06%of listed UK wind farms capacity
β‰ˆ 42 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 18.4 MW station would generate roughly 42 GWh of electricity in a year, similar to the annual use of about 15,520 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Northern Ireland All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Developer / operator
Greencoat (formerly Energia Renewables)
Planning authority
Derry City and Strabane
Planning reference
J/2005/0358/F
Application submitted
6 April 2005
Permission granted
26 April 2007
Construction started
1 May 2011
Began operating
1 June 2012
Capacity in planning record
18.4 MW
Address
Church Hill, Meenamullan Road, Killeter, Castlederg, and Magherakeel, Killeter, Castlederg, Co Tyrone., Co. Tyrone
REPD reference
4047

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.