πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
WIND Β· OPERATIONAL

Burbo Extension

Burbo Extension is a 259 MW offshore wind farm in North West England, operated by Orsted. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Offshore
  • North West
  • England

Key facts

Installed capacity
259 MW
Status
Operational
Technology
Wind Β· Offshore
Operator
Orsted
Region
North West
Country
England
Grid connection (DUKES)
HV
Combined heat & power
No
Coordinates
53.4800, -3.2700

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Burbo Extension compares

26th of 488largest wind farms in the UK register
6th of 32in North West
0.88%of listed UK wind farms capacity
β‰ˆ 862 GWhillustrative output a year

At a typical UK load factor for this technology (about 38% of the maximum possible output), a 259 MW station would generate roughly 862 GWh of electricity in a year, similar to the annual use of about 319,320 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in North West All run by Orsted

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Burbo Bank Extension (Burbo Bank 2)
Developer / operator
Orsted (formerly Dong Energy)
Planning authority
The Planning Inspectorate - National Infrastructure
Planning reference
EN010026
Application submitted
22 March 2013
Permission granted
10 December 2014
Construction started
10 June 2016
Began operating
27 April 2017
Capacity in planning record
258 MW
Address
Burbo Flats, Liverpool Bay, approximately 6.4km (4.0 miles) from the Sefton coastline and 7.2km (4.5 miles) from North Wirral., Offshore
REPD reference
2539

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026