Rhyl Flats

Rhyl Flats is a 90 MW offshore wind farm in Wales, operated by RWE Npower. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Offshore
  • Wales
Project stageOperating
  1. PlanningMar 2002 (completed)
  2. ConsentedJan 2003 (completed)
  3. ConstructionSep 2007 (completed)
  4. OperatingDec 2009 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
90 MW
Status
Operational
Technology
Wind Β· Offshore
Operator
RWE Npower
Region
Wales
Country
Wales
Grid connection (DUKES)
LV
Combined heat & power
No
Coordinates
53.3776, -3.6402

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Rhyl Flats compares

61st of 488largest wind farms in the UK register
4th of 43in Wales
0.31%of listed UK wind farms capacity
β‰ˆ 300 GWhillustrative output a year

At a typical UK load factor for this technology (about 38% of the maximum possible output), a 90 MW station would generate roughly 300 GWh of electricity in a year, similar to the annual use of about 110,960 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Wales All run by RWE Npower

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Rhyl FlatsΒ 
Developer / operator
RWE Npower
Planning authority
DECC (S36)
Application submitted
25 March 2002
Permission granted
1 January 2003
Construction started
1 September 2007
Began operating
28 December 2009
Capacity in planning record
90 MW
Address
8km Abergele, five miles off the North Wales coast in Liverpool Bay, Offshore
REPD reference
2495

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.