Wraysbury
Wraysbury is a 3.05 MW solar farm in South East England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South East
- England
Key facts
- Installed capacity
- 3.05 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Greencoat Capital
- Region
- South East
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- TW19 5AH
- Coordinates
- 51.4447, -0.5410
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Wraysbury compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 3.05 MW station would generate roughly 2.7 GWh of electricity in a year, similar to the annual use of about 990 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South East All run by Greencoat CapitalNearby generating sites
- Slough Heat & Power Β· 35 MW biomass power station10.7 km
- Walton Β· 1.79 MW solar farm10.9 km
- QE2 Reservoir Β· 6.34 MW solar farm12.1 km
- Battersea Power Station Β· 509 MW coal-fired power station27.8 km
- Hungerford Β· 4.47 MW solar farm29.9 km
- Sheepbridge Β· 5 MW solar farm30.2 km
- Croydon Β· 50 MW open-cycle gas power station30.6 km
- Green Park Β· 2 MW onshore wind farm30.8 km
Also operated by Greencoat Capital
Greencoat Capital operates 195 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Wraysbury Landfill
- Developer / operator
- Sirius Solar Building
- Planning authority
- Windsor and Maidenhead
- Planning reference
- 14/02044/FULL
- Application submitted
- 2 July 2014
- Permission granted
- 29 October 2014
- Construction started
- 6 February 2017
- Began operating
- 21 March 2017
- Capacity in planning record
- 4.8 MW
- Address
- Former Wraysbury Landfill, Adj Staines Road, Wraysbury, Staines, Middlesex, TW19 5BS, Berkshire
- REPD reference
- 1938
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026