SOLAR Β· OPERATIONAL

Steventon

Steventon is a 10 MW solar farm in South East England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South East
  • England

Key facts

Installed capacity
10 MW
Status
Operational
Technology
Solar Β· PV
Operator
Anesco
Region
South East
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
OX13 6AP
Coordinates
51.6334, -1.3613

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Steventon compares

142nd of 662largest solar farms in the UK register
28th of 105in South East
0.18%of listed UK solar farms capacity
β‰ˆ 8.8 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 10 MW station would generate roughly 8.8 GWh of electricity in a year, similar to the annual use of about 3,260 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South East All run by Anesco

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Steventon Solar Park
Developer / operator
Foresight
Planning authority
Vale of White Horse
Planning reference
P12/V1571/FUL
Application submitted
18 July 2012
Permission granted
17 October 2012
Construction started
15 March 2014
Began operating
19 June 2014
Capacity in planning record
10 MW
Address
Land to West of Steventon Field, Steventon, Abingdon, Oxon, Oxfordshire
REPD reference
1817

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.