Rymes
Rymes is a 4.99 MW solar farm in South West England, operated by Capital Dynamics UK. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South West
- England
Key facts
- Installed capacity
- 4.99 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Capital Dynamics UK
- Region
- South West
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- GL19 3AJ
- Coordinates
- 51.9252, -2.3787
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Rymes compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.99 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South West All run by Capital Dynamics UKNearby generating sites
- Home Farm Β· 4.99 MW solar farm19.9 km
- Hill House Farm Β· 28.3 MW solar farm21.1 km
- Milkwall Solar Farm Β· 3.5 MW solar farm22.8 km
- Box Road Β· 1.9 MW solar farm22.8 km
- Coleford Pingry Solar Farm Β· 3.4 MW solar farm23.1 km
- Defford Β· 50 MW solar farm25.8 km
- Lynch Knoll Β· 0.5 MW onshore wind farm26.0 km
- Berkeley Nuclear Power Station Β· 276 MW nuclear power station27.3 km
Also operated by Capital Dynamics UK
Capital Dynamics UK operates 25 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Land At Rymes Farm (Phase 1)
- Developer / operator
- TGC Renewables
- Planning authority
- Forest of Dean
- Planning reference
- P1977/14/FUL
- Application submitted
- 23 December 2014
- Permission granted
- 12 June 2015
- Construction started
- 5 January 2016
- Began operating
- 31 March 2016
- Capacity in planning record
- 6.9 MW
- Address
- Land At Rymes Farm, Malswick, Newent, Gloucestershire, Gloucestershire, GL18 1HF
- REPD reference
- 4939
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.